Bituminous Concrete Paving
ID:
1
Description:
Three-part training tape for construction inspectors: (1) preliminary checks and equipment; (2) surface preparation and tack coats; (3) delivery of hot mix, paving, compaction, and final project acceptance.
Video Year:
1984
Video Length:
45 min
Source:
Video Format:
VHS
Video Status:
Active
Subject(s):




